Plasterboard cladding must always be carried out according to the technology and according to certain rulesPlasterboard cladding must always be carried out according to the technology and on certain pravilamKazhdy person affiliated to the repair and construction of, he understands how important it is in this case drywall. But this is not always enough, especially if you work with him in the main house. One must not only know the theory, but also have practical experience, they say, with their own hands. And the experience should be versatile, in different conditions, in different teams. It lets you know about all the possible nuances of the construction process. However, it is necessary to leave the argument, and to consider in more detail.


Why GCR facing walls

Whenever they are going to use the FCL, do not just. Not because of the fact that all true. Such as wallpaper. But for some specific reason. Most often the reason for this are wall defects. After all, every owner wants to put the tiles exactly, beautiful pokleit wallpaper, paint the wall properly. And if you're unlucky, it is drywall will help you.

GCR in this case masks the different pits, holes, breaks, and so on. And do decorative work carried out over the plate GCR.

Unfortunately, not all of the walls correspond to snip. That is why, drywall is often used to simply align the wall. It is necessary to put some decorative elements. These properties allow you to simultaneously correct the defects and level walls. Useful, is not it?

With the help of drywall at facing of walls, you can completely hide all communicationWith the help of drywall at facing of walls, you can completely hide all communication

Here is a short list of what you need to do is:


  • Masking defects of the walls;
  • To align the walls;
  • Acoustic and thermal insulation of walls;
  • Communications sewing.

But, apart from correcting the defects of the walls, in the GCR has other functions. Sound and heat insulation. Due to its density, this tile perfectly isolates any impact on the world around the room, upholstered GCR.

In addition, drywall perfectly conceals everyday communication. Pipes, cables, etc., are laid along the wall and sutured it. Wall later can be decorated to your taste.

How is the GCR lining

When discussing such topics, technical data required.



Two ways to FCL installation:

  • Glue the plates on the wall;
  • Mount frame and sew sheets on it.

The first method is much more economical and easier. This is because in this case is not required to use a metallic element. This method is suitable for those cases where it is not necessary to hide pipes and wires, and just need to make a good, smooth wall, to then decorate it nicely.

Before facing the wall is necessary to set the frame to which are attached the drywall sheetsBefore facing the wall is necessary to set the frame to which are attached the drywall sheets

In this case, you do not have to make the frame and paneling, that can save a good amount. You just need to choose the right glue and glue the drywall to the wall, so that it was on the same plane.

First you need to completely clean the surface of the wall. Remove all the old paint, stains, fillers, etc. Then evaluate the evenness of the wall, the best level. If the irregularities are not too terrible, the suit plastered. It is applied to the plate, after which the sheet of drywall mounted on a wall, in a predetermined markup place. It is necessary to measure not only where the plate will be attached FCL, but also where it will be smeared with primer. In addition, it is recommended to prime the wall, especially if it is external.

If the wall is not too smooth, it is better to use glue. It needs to be spread over the center line and the plate perimeter, it can be done easily with a trowel. And the wall is necessary to drive the dowels and screw the screws so that hats were on the same level. Then you need to press to plate screws.

The original method of cladding with plasterboard

If the irregularities are too big, you can try another way. Strips drywall length in the wall and a width of 10 cm, glued to each other, after which they glue already full plate GCR. But this method will take away a little space of the room itself.

If you mount the plate to the ceiling, you need to leave a small space. This is to ensure that the glue can dry quickly. Once the glue dries, the last step is the installation of the GCR.


When gluing gypsum board on the surface of the wall is very important that it is as flatWhen gluing gypsum board on the surface of the wall is very important that it is as flat

All seams that remain after the installation it is necessary to cover the tape-serpyanku, putty and sandpaper to smooth out and cover the starting and finishing putty.

The second way is much more difficult, requires more resources. But the result of this work and will hold much longer. If mount frameless not your option, you should make a frame made of wood or metal elements, it usually it is used in such works. This design is set along the wall, repeating its plane, but can be moved away from it to the required distance. This can be done, if you plan to insulation, insulation or laying in the wall communications.

Instructions facing internal plasterboard walls with his own hands

So you've decided to make the frame. Then you need to clearly and carefully follow the markings. The first mark made on the floor in the same set, and UD-profile. To mark misalignment, use a thread. Then, the screws need to be fixed first ceiling profile, and then the side parts. This creates a frame around the perimeter.

The next step - support section attachment. Locate they must step in 60 or 30 cm, for mounting plates GCR size 1200x600. On the hardness and frequency of the profiles depends on the high cost of the assembly. On the wall of their attached directly suspensions.


During the entire installation plasterboard wall covering must be remembered frame flatnessDuring the entire installation plasterboard wall covering must be remembered frame flatness

Sam suspension is mounted to the wall, and then rework it so that it looked like the letter "P" and bolted to the CD-profile. 

It is only now starting to sew sheets of drywall. They first need to fix the profiles, it is done with screws. Tighten their need at the edges and in the center in increments of 20-30 cm. Hats drown in the surface of the sheets 0.5-1 mm, so that they are flush with the board, but do not hurt him. Finishing the same as in the first method.

Own hands: lined with plasterboard walls (video)

As it turned out, wall cladding, is not so complicated and incomprehensible thing. If you look, check out the relevant articles, see the appropriate manuals, everyone will understand, especially if you have some experience in the relevant environment. Of course, this article is a short guide -skoree than full and comprehensive information on the topic. In addition, you can always try to consult with more experienced specialists and professional builders.