Quality and proper fastening drywall

Quality and proper fastening drywall

12 October 2017



Drywall is a rather popular material that is often used for walls and ceilingsDrywall is a rather popular material that is often used for walls and potolkovGipsokarton - a versatile material that is used in various kinds of repair work. It provides an opportunity to quickly change the state space. But the budget is quite optimistic. Because drywall is so popular, learn to work with who can actually each.


Intervals (distance) fixing plasterboard

In this case, it depends on the type of gypsum board - the shorter the distance between supports, the more robust will sheet. In this case, the best option would be sticky. This method is not always because metal profile is used.

Catching installing drywall, be sure to remember the interval between the sheetsCatching installing drywall, be sure to remember the interval between the sheets

There are building codes that require:

  • You need to install the support rails, at least for the wall plaster than 40 cm;
  • Moisture resistant plasterboard involves interval every 60 cm;
  • Ceiling drywall - you need to collect the net profile for it, the size of a cell no more than 40 to 40 cm.

But not enough that you are setting the bar with a reference step.


It is very important - to competently make the holes for the screws. If they are screwed too often, then compromise the integrity of the sheet, it will crumble and fall. If mounts a little, then the consequences will be the same.

Recommended following distance between the screws - each 20 cm is necessary to consider that the distance from the sheet edge to the screw should be at least half a centimeter, otherwise, the edge crumble..

What and how to strengthen the plasterboard with their hands

All installation work is recommended to carry out the relevant types of screws. And there are only two - it screws for metal, and screws for drywall. The first type of screw is divided into two subtypes: the metal-to-metal and metal-wood. Metal-to-metal connections necessary for the profiles. A screw on the end of a drill equipped with a special, which easily allows to connect the elements with each other.

Without high-quality screws can not be securely fasten drywall to the frame, so it is better purchased in advanceWithout high-quality screws can not be securely fasten drywall to the frame, so it is better purchased in advance



A screw-type metal-tree is used, if the need to attach the profile to the wooden structure. The end of the screw sharp, it forcibly cuts the metal, but tightly fixed in the wood. Drywall screws are distinguished, if we talk about them, first of all, length and thickness.

For attaching drywall screws fit with a black coating phosphated. It reduces friction, it is, firstly, and, secondly, to protect against corrosion. When cutting a drywall seam will not destroy the structure of the gypsum.

installation process: how to fasten drywall, step by step guide

Drywall installation will consist of four stages - a measurement and drawing, the frame assembly, installation of insulation and sound insulation material, installation of drywall.

Before you begin to install the drywall, must first correctly assemble the metal frameBefore you begin to install the drywall, must first correctly assemble the metal frame

Remove the measurements and draw a plan, how do you see the future of construction, it is very important.

If you plan to fix the drywall only on the wall, on the plane display frame is sufficient.

frame assembly:

  • First, set the guides - a U-shaped profile and is attached top and bottom walls, or on the perimeter of the ceiling. They need to establish exactly perfect.
  • If, however, between the profile and the wall a gap, you must install a thick cardboard or wood.
  • Depending on what kind of frame rails have to be fixed with dowels in increments of 30 cm from each other. After installing the rails is the frame assembly.

This is followed by the installation of drywall.

First the one corner sheet which is fixed by one screw. Then there is the level of checking and fixing the cross of the second screw. The sheet is then "crimped" perimeter. The sheet is then bolted to the supporting strips. This procedure requires a consistent performance.


What is needed for fastening drywall to the ceiling

Alone to work hard because think in advance about how to have a partner. Many people decide that if the sheet is cut into relatively small pieces, can cope alone. But a large number of horizontal seams will not make a beautiful ceiling.

In order to produce a quality installation of gypsum board on the wall, best to seek professional helpIn order to produce a quality installation of gypsum board on the wall, best to seek professional help

When the assistant is found, let it for something like a long mop. This tool will be an assistant to hold the plaster board, while you fasten it to a profile. It has its own cunning, how to lift the sheet from the first time.

First, the installer climbs to the forest, then the assistant will give him one end of the plate, and he'll start at that end of the second lift. When between the plaster and the pier will get a mop, it should be inserted. Then plaster board rises to the ceiling.

Fixing plasterboard to glue

And this version can also be found. But this assumes the condition that the mounting surface is flat. In short, not always the adhesive method is possible in principle.


Install drywall sheets on the wall you can with your hands, most importantly - in advance to buy a special glue and other necessary materials for workInstall drywall sheets on the wall you can with your hands, most importantly - in advance to buy a special glue and other necessary materials for work

Mounting glue to do one of three ways:

  • Solid. We need, as already mentioned, a perfect flatness of the wall. Notched trowel sheet surface coated adhesive filler which longitudinal strips distributed over the circumference.
  • Lighthouse. When before height no greater than 2 cm, more conveniently plasterboard secured to a concrete wall, the adhesive coating the sheet piles.
  • Plasterboard strips. First base aligned, cleaned from dust, porous surfaces are primed. Before assembling sheets are cut out holes for the outlet. On the walls paste pre-prepared strips or squares of drywall. They are regulated by the level of the rule and a plumb line.

Another common question - what and how to strengthen the GCR to foam. There is a piece of advice: stick foam cement glue, and then - in the same glue drywall. You can glue the foam to the net, and only over the mesh drywall.

Examples of how to mount plasterboard (video)

Fastening drywall - a simple technology, if not to engage in independent action. Correct attachment, good skeleton, tools, parts, and the work does not seem like a complex.

Good repair!

Комментарии

Leave a Reply

Your email address will not be published. Required fields are marked *

+ 88 = 95

map